619-1005L-Bsp Air Dryer Cooler Plate Fin Heat Exchanger
Contact Supplier
Product Highlights
- Compact Integrated Design: Integrates pre-cooling, evaporation, demisting, and water-separating for compact structure.
- Wide Capacity Range: Supports single unit air-treating capacity from 1.5m3/min to 200m3/min.
- Durable Aluminum Material: Constructed with aluminum plate bar for robust heat exchange performance.
- Comprehensive Certifications: Certified with CE, ISO9001-2008, ISO14001-2004, EN15085, and PED.
- Flexible OEM/ODM Service: Offers customization from samples and designs with OEM and ODM services available.
- One Year Warranty: Includes a one-year warranty period for product assurance.
- Online After-Sales Support: Provides online after-sales service for technical assistance.
Product Attributes
- Customization
- Available
- After-sales Service
- Online
- Warranty
- One Year
- Certification
- CE, ISO
- Application
- Cooler
- Principle
- Recuperative Heat Exchanger
- Style
- Plate Type
- Material
- Aluminum
- Delivery Time
- 25-35 Days
- Transport Package
- Plywood Case
- Specification
- aluminum
- Trademark
- Yuda
- Origin
- Wuxi, China
- HS Code
- 87089190
- Production Capacity
- 1600PCS/Month
Product Images of 619-1005L-Bsp Air Dryer Cooler Plate Fin Heat Exchanger
Find Similar Products
Product Description
Product Description
The pre-cooler, air dryer evaporator, integrated design of pre-cooling, evaporation, demisting and water-separating, compact and less losing, lowest dewpoint to 6°C.
Model: B6004 (11m3/min)
Product: A type Refrigeration Air Dryer Cooler
Structure: aluminum plate bar
COOLING Medium: Freon(R22, R404A or R134a compressed cooling air)
AIR INLET PRESSURE : 8bar (gage pressure)
DEW POINT: 8°C
PRESSURE DROP < 0.2bar
Certification: ISO9001-2008, ISO14001-2004, EN15085, PED(CE)
Warranty: One year
OEM supplier
Single unit for air-treating capacity: 1.5m3/min-200m3/min.





We are dedicated to quality of plate bar heat exchanger and production safety, to supply good coolers and service for you.
The process we produce air dryer coolers
The way we pack kinds of bar plate heat exchangers
Please contact us if you have any request on air dryer cooler
About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR2341055". Items marked "" are certified.
Company Profile
Established in 2005, Yuda is a specialist manufacturer of aluminum plate&bar heat exchangers. The company covers an area of 12000 square meters, 202 employees, of which engineer 11 people, QC 8 people.
Our company has the advanced vacuum braze fumace and special fin machine and professional testing equipment.
Our products are widely used in industry such as: Compressor, Air separation, air dryer, Construction machinery, , wind power.
The category is as follow:
For air compressor: Oil cooler, after cooler, combined oil cooler/after cooler and oil-air heat exchanger for compressor
For air separation, nitrogen and oxygen manufacturing equipment: Generator, subcooler, main heat exchanger, condensed evaporator
For pre-cooling and evaporation is refrigeration dryer: Pre-cooler evaporation
For construction machinery, diesel: Engine oil cooler, charge air cooling-oil heat exchanger
For wind power: Gear box oil cooler, ouside /inside converter cabinet water cooler, Cold plate for Cabinet
We follows the quality standard of ISO9001-2000, OHSAS/OHSMS18001, ISO14001, and CE CERTIFICATE to organize our production accompanied by our rich experiences
We don't want "made in China " is just a simply saying and label; We aim it to be also good quality, perfect design We want it more confident.
We strictly control the quality of products and we require precise products.
No matter what the production process is, we will make every endeavor to do it well once the standard is set up.
Heat-exchange leader, doyen of the industry
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 28, Changkang Road, Industrial Park, Mashan, Wuxi, Jiangsu, China
-
Plant Area
- 17700 square meters
-
Number of Employees
- 260
-
Registered Capital
- 11,580,000 RMB
-
Terms of Payment
- LC, T/T, Western Union
-
International Commercial Terms(Incoterms)
- FOB, CIF, EXW, CFR
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shanghai Port
-
Minimum Order Quantity
- 1 pc
-
Supply Chain Partners
- 40
Our Production Capability & Technical Expertise
-
Main Products
- Wind Power Water Cooler, Engineering Hydraulic Oil Cooler, Air Dryer Cooler, Intercooler, Compressor Aftercooler and other Cooling System
-
Production Lines
- 5
-
Production Machines
- Forming Machine, Vacuum Brazing Machine, Spraying Line
-
QA/QC inspectors
- 8 people
-
Inspection Type for Finished Products
- Random inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 10 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2006-02-10
-
Export Year
- 17 Years
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
-
Repeat Buyers Choice
- 50%~80%
-
Number of Foreign Trading Staff
- 7
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Cooperated with Fortune 500
- Yes
FAQ
- What is the warranty period?
- We provide a one-year warranty for this product.
- What is the air inlet pressure?
- The air inlet pressure is 8 bar (gage pressure).
- Do you offer OEM and ODM services?
- Yes, we offer both OEM and ODM services with customization available from samples and designs.
- What is the minimum order quantity?
- The minimum order quantity is 1 piece.
- What is the lead time for delivery?
- The delivery time is 25-35 days. During peak season, it takes one month, and during off-season, it is within 15 workdays.
- What cooling mediums are supported?
- The supported cooling mediums are Freon R22, R404A, or R134A.
- What certifications does the product have?
- The product is certified with CE, ISO9001-2008, ISO14001-2004, EN15085, and PED.
Send your message to this supplier
People who viewed this also viewed
-
US$400.00-470.00 / Piece
-
US$313.00-380.00 / Piece
-
US$729.00-799.00 / Set
-
US$238.00-260.00 / Piece
-
US$220.00-238.00 / Piece
-
US$150.00-180.00 / Piece
-
US$130.00-150.00 / Piece
-
US$115.00-165.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- For Dryers
- 619-1005L-Bsp Air Dryer Cooler Plate Fin Heat Exchanger
Related Categories
Hot Searches
- Air Cooler Factories
- Heat Plate
- Dryer Air Factories
- Heat Cooler Factories
- Heat Exchanger Cooler
- Heat Exchanger For Cooler
- Air Cooler Heat Exchanger
- Water Cooler Heat Exchanger
- Cooler Plate Exchanger
- Air Dryer Cooler Bulkbuy